Home ProductsSerrated Fin Tube

Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192

Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192

Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192

Product Details:

Place of Origin: JIANGSU,CHINA
Brand Name: JYCT
Certification: ISO9001:2008 authorized by SGS
Model Number: HFW SERRATED -15

Payment & Shipping Terms:

Minimum Order Quantity: customized
Price: Negotiable
Packaging Details: as per export packing standard
Delivery Time: Within 45 days after received your deposits
Supply Ability: 50 tons per day
Contact Now
Detailed Product Description
Year Established: 2008 Material: Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy Etc.
Payment Terms: T/T In Advance, Or Irrevocable L/C At Sight Size: Customized
Bare Tube OD: 16-219mm Fin Pitch: 3-25mm
High Light:

wire wound fin tubes

,

spiral serrated finned tubes

HFW sprial SERRATED fin tubes apply in boilers, economizers

Base tube material: SA192 OD31.8mm X3.2mmTHK X6000mm LG
Fin Material: CS  H19mmxT1.0mm-5FPI
 
Manufacturing Process:
The fin strip is welded continuously and spirally wound onto a polished bare tube. And the tube and fins are bonded together by using high frequency resistance welding technique.
 
 
 
 
Material: Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.
Bare tube OD: 16-219mm Fin Pitch: 3-25mm Fin Height: 5-30mm Fin Thick: 0.8-3mm

Name

Base tube
(OD) mm

Fin Pitch
(mm)

length
(m)

 MinMaxMinMaxMinMax
Extruded aluminum fin tube12.7512.1100.520
L/LL/KL aluminum fin tube19512.13.20.515
Embedded aluminum fin tube19422.33.20.515
Low fin tube12.7320.820.520
Spiral fin tube12.770  0.520
ERW HF spiral fin tube162193250.528
ERW HF spiral serrated fin tube162193250.528
 

Serrated width(mm)
10 min~26 max

Serrated depth(mm)
4 min~16 max

ERW studded tube892001650215
       
DC ERW H/HH fin tube2551925115
H/HH fins

Length(mm)
60 min-150 max

Thickness(mm)
1.5 min~4 max

Width(mm)
30 min~50 max

 
 
Application: The High Frequency Resistance Welded Helical Fin Tubes are widely applied in fired heaters, heat exchanger, boilers, economizers, pre-heaters, heat pipes, heaters etc…
 
Capacity: Seven ERW High Frequency fining lines, daily capacity around 50 tons,length≤28meters;
 
Products&Inspection Deatails:
 
 
 Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192
 
 
Welding
 
 
Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192
 
Description of the inspections carried out
Following documentations should be reviewed & endorsed:
1. Declaration of conformity,
2. Inspection plan,
3. Welding book(WPS & PQR),
4. Finned tubes examination reports
(dimension & visual inspection, hardness test report, tensile test report),
5.Test samples sheet,
6.Incoming inspection report,
7.Inspection certificate for bare tube,
8.Quality test certificate for steel strip,
9.Iinspection & Guarantee certificate for finned tube,
10.Product inspection report.
 
 
 
 
Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins
 
 
 
Serrated Metal Aluminum Welded Fin Tube For Heating And Cooling SA192
 
 
 
 

FAQ
 

About our company
A------We have three company,
1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)
2.Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)
3.Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)
Besides the companies above mentioned, we don’t have any other name.
 
About Our main business
A------DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.
 
About Price terms
A------It could be EXW, FOB,CIF,CNF
 
About Payment Term
A------We usually accept payment by T/T in advance or by L/C available against draft at sight
 
About Lead Time
A------Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
 
About Quality Control
A----
Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports
 
 
About Sample
A---If you are interested in our above products, please contact us.
      We can provide small samples in store for you, and you are welcome to visit our factory
 
Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.

 
 
 
 
 
 
 
 
 

Contact Details
AARE CUN TAI THERMAL LTD.

Contact Person: aare_cuntai_gqz

Send your inquiry directly to us (0 / 3000)

Other Products