Home ProductsCorrugated Metal Tube

Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

    • Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe
    • Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe
    • Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe
    • Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe
  • Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

    Product Details:

    Place of Origin: JIANGSU,CHINA
    Brand Name: JYCT
    Certification: ISO9001:2008 authorized by SGS
    Model Number: C-2

    Payment & Shipping Terms:

    Minimum Order Quantity: customized
    Price: Negotiable
    Packaging Details: as per export packing standard, custom packing is available
    Delivery Time: Within 45 days after received your deposits
    Supply Ability: 50 tons per day
    Detailed Product Description
    Year Established: 2008 Size: Customized
    Payment Terms: T/T In Advance, Or Irrevocable L/C At Sight Material: Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy Etc.
    Bare Tube OD: 16-51mm Fin Pitch: 8-30mm

    Corrugated tube

     

    Material: Copper,Copper Stainless Steel,Carbon Steel, etc.

    Bare tube OD:16-51mm Fin Pitch: 8-30mm Fin Height: <2.5mm


    Following documentations should be reviewed & endorsed:

    Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip

    Mill test cetification for bare tube

    Mill test cetification for fin (alu.tube / alu. strip / steel strip)

    Mill test cetification for finned tube

    Finned tubes dimension & visual inspection reports

     


    Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins

     

     

    Name

    Base tube

    (OD) mm

    Fin Pitch

    (mm)

    length

    (m)

      Min Max Min Max Min Max
    Extruded aluminum fin tube 8 51 1.6 10 0.5 20
    L/LL/KL aluminum fin tube 16 63 2.1 5 0.5 15
    Embedded aluminum fin tube 16 63 2.1 5 0.5 15
    Low fin tube 10 38 0.6 2 0.5 20
    Spiral fin tube 12.7 70     0.5 20
    ERW HF spiral fin tube 16 219 3 25 0.5 28
    ERW HF spiral serrated fin tube 16 219 3 25 0.5 28
     

    Serrated width(mm)

    10 min~26 max

    Serrated depth(mm)

    4 min~16 max

    ERW studded tube 25 219 8 30 2 15
                 
    DC ERW H/HH fin tube 25 63 8 30 1 15
    H/HH fins

    Length(mm)

    60 min-150 max

    Thickness(mm)

    1.5 min~4 max

    Width(mm)

    30 min~50 max


    Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe
    Application: mainly used in petrochemical, electric power, paper making, building heating and other industry such as air cooler, air heater and air heater of food industry, plant starch spray drying system.
     
    Capacity: 80000 Meter Per Month
     
     
    Products:

     

     

     

    Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

     

     

     

     

    Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

    Corrugated Stainless Steel Tubing , Galvanized Corrugated Metal Pipe

     

     
     
    FAQ
     

    About our company

    A------We have three company,

    1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)

    2.Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)

    3.Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)

    Besides the companies above mentioned, we don’t have any other name.

     

    About Our main business
    A------DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
    High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
    Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

     

    About Price terms

    A------It could be EXW, FOB,CIF,CNF

     

    About Payment Term

    A------We usually accept payment by T/T in advance or by L/C available against draft at sight

     

    About Lead Time

    A------Usually it takes about 35-45 days after we received your confirmation.

    However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

     

    About Quality Control

    A----

    Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip

    Mill test cetification for bare tube

    Mill test cetification for fin (alu.tube / alu. strip / steel strip)

    Mill test cetification for finned tube

    Finned tubes dimension & visual inspection reports

     

     

    About Sample

    A---If you are interested in our above products, please contact us.

    We can provide small samples in store for you, and you are welcome to visit visit our factory

     

    Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.


     
     

    Contact Details
    AARE CUN TAI THERMAL LTD.

    Contact Person: aare_cuntai_gqz

    Send your inquiry directly to us (0 / 3000)